2008 Summer Market and Reliability Assessment, May 15, 2008: “The reliability and adequacy of the bulk power system this summer, as forecasted by the planning authorities and reviewed by the Regional Entities and NERC is projected to be adequate. Extreme weather conditions and major outages of generation and transmission pose risks to reliability and where these risks are significant, contingency plans, including operating procedures, are expected to be in place to manage these risks.”
Sorry, comments are closed for this post.